This tester requires a 3-phase AC 380 V, 50/60 Hz supply for installation. Plan the site connection around that utility, especially if the wash fastness station is being added to a shared textile testing room or production area.

For a smoother install, confirm the phase service and local electrical setup before delivery so the unit can be placed and commissioned without delays. The standard package already includes the washing cups and stainless steel balls, so the main site requirement is matching the power feed to the tester.

Need help validating the installation setup for your wash fastness lab? You can learn more about this tester or request a quote for a configuration review.