This system requires a 220 V power supply, 50 to 60 Hz, for installation and operation.

For a smooth install, the main goal is to provide a stable, correctly wired 220 V feed that matches your facility’s local electrical practices, including proper grounding and protection per site code.

Electrical details are typically finalized based on facility and site requirements such as:

  • Your local power standard and the receptacle or disconnect style used in your lab
  • How you want the unit integrated into your prep area, including cable routing and safety access
  • Any internal QA or EHS requirements for dedicated circuits and lockout procedures