Routine maintenance and calibration depend on operating frequency and material type. For most testing environments, a preventive maintenance check every 6 months is sufficient to keep motion accuracy and spindle stability at peak levels. Systems used for continuous production or harder materials may require more frequent inspection. Maintenance usually includes spindle lubrication, axis alignment verification, and software calibration. Through the NextGen Service Plan, facilities can schedule regular visits and operator training to keep specimen preparation precise and reliable throughout the equipment’s lifetime.