Multiple units are controlled from a single PC over LAN or through Ethernet and USB hub connections.

For a laboratory running triaxial tests in parallel, that is the difference between one operator supervising a bank of frames and one operator per frame.

Consolidation stages in particular run for days, so the value shows up in supervision rather than in test time. To scope a multi-frame layout, request a quote.